Our projects

– Reconstruction of the system of electrochemical protection in the territory of gas treatment unit-3 “Sviridovka” of “Poltavanaftogaz” in the village of Yakhniki, Lokhvytsky district, Poltava region

– Reconstruction of the system of cathodic protection of wells of Sviridovsk GCF wells

– Reconstruction of local treatment facilities of JV Vitmark-Ukraine LLC

  • Construction of the main gas interconnector “Drozdovychi – Bilche – Volytsya”
  • Turnkey construction of cross-over beam of pipelines over Amudaria river for the second gas pipeline string “Malay – Bagtyyarlyk”
  • Modernization and renovation of the main gas pipeline Urengoy-Pomary-Uzhgorod on the sites 4101.3 km – 4128.4 km; 3364.5 km – 3391.2 km
  • Geological engineering survey along the oil product pipeline “Mozyr – Bernady – Pryluky” for the construction design development
  • Pulp pipelines USP “Yeristove mine and concentrator complex” Co., Ltd.  – Odesa (port Pivdenny) on the sites 166.3 km – 233 km
  • Complex engineering survey for detailed design development of gas pipeline branch PN-7,5 MPа to “Vorsklastal” gas distribution station 
  • Gas pipeline branch design and construction from the city of Ulianivka to the city of Gayvoron
  • Kungurska –Almazna – Polyanska fiber-optic link of Urengoy – Petrovsk pipeline 
  • “Urengoy – Novopskov” pipeline reconstruction on the site Petrovsk – Pysarevka. Submerged crossing over Don river 
  • Pipeline branch to Kopaygorod and Murovani Kurylivtsi, Vinnytsya region, I, ІІ, ІІІ and IV construction stage of gas distribution station
  • Analyzing field data of hydrographic surveys on gas pipelines: 26 “Pipeline (MCR-A), 12” Pipeline (MCR-A), 14 “Pipeline (GDW), 12” Export Pipeline (SPM)

  •  

    Gas bulkhead from Olefirivsk gas treatment unit main gas pipeline – Shebelynka-Poltava-Kyiv main gas pipeline to Shebelynka-Dykanka-Kiev gas pipeline

  •  

    Engineering and geological survey at a wind farm construction site in the village Zaturci, Lokachynsky district of Volyn region

  • Certification of pipeline branches of Bogorodchany main-pipeline field-operation department based on GIS technologies
  • Certification of pipeline branches of Khust main-pipeline field-operation department based on GIS technologies
  • Certification of pipeline branches of Novomoskovsk main-pipeline field-operation department based on GIS technologies
  • Reconstruction of linear part of gas pipeline to Novomoskovsk underground gas storage facility
  • River Park district gas supply in the city of Beer Sheva 
  • Technological calculations and algorithms development for the pipeline EPC Works for DN700 MOP 54 gas pipeline from Kiili to Paldiski
  • Pipeline branch construction to Kremenchuk gas distribution station
  • Gas flow-lines and methanol pipelines of Yaroktynsky oil, gas and condensate field
  • Total overhaul of the linear section of the pipeline “Brody – Derzhkordon (State border)” of the 1st stage with replacement pipeline Du-500 on the site 110.6 – 119.2 km
  • Linear section at object “Yagotyn compressor station reconstruction”
  • Reconstruction of the local waste water treatments facilities “Vitmark-Ukraine” Co., Ltd. 
  • Reconstruction of the biological waste water treatments facilities on the compressor station  34 Sofiivska
  • Reconstruction of the biological waste water treatments facilities on the compressor station  35 Stavyschchenska
  • Reconstruction of the biological waste water treatments facilities on the compressor station  1 “Zadniprovska” (updating of design documentation)
  • Construction of the biological waste water treatments facilities of the utility fluids for the administrative building and services areas of LLC “Regal petroleum corporation limited”
  • Complex works to optimize the operation of waste water treatments facilities of “Enzym” Private Joint-Stock Company
  • Reconstruction of all-plant control system of main board-1 and automatic control system of gas compressor unit №2, compressor department №1 of “Bilche – Volytsya” boosting compressor station of Stryy main-pipeline field-operation department
  • Construction of  standby plant of compressor station “Uzhgorod” (construction and in-line renovation)
  • Construction of  standby plant of compressor station “Bogorodchany” (construction and in-line renovation)
  • Methanol storage construction for 200 m3 of Proletarsky underground gas storage facility
  • Installation of operational gas and injection wells, gas pipeline system for collection and injection for gas and oil-associated gas treatment unit needs of Yaroktynsky oil, gas and condensate field 
  • Pipeline Urengoy- Centre 1 Pelym compressor station reconstruction 
  • Pipeline Urengoy- Centre 2 Pelym compressor station reconstruction 
  • Reconstruction of three-stage gas extraction control system of  “Bilche – Volytsya” boosting compressor station of Stryy main-pipeline field-operation department
  • Reconstruction of the automatic control system and the fuel control system of gas compressor unit №1 of compressor department №2 of compressor station “Uzhgorod” (construction and in-line renovation)
  • Reconstruction of lightning protection system “Dykanka” compressor station of Dykanka main-pipeline field-operation department, Sumy working site of Sumy main-pipeline field-operation department, “Krasyliv” compressor station of Krasyliv main-pipeline field-operation department (construction and in-line renovation)
  • Reconstruction of the compressor station Yagotyn

  • Reconstruction of the system of electrochemical protection on the territory of gas treatment unit -3 “Svyrydivka” of “Poltavanaftogaz” in Yakhnyky, Lokhvytsky district, Poltava region

  • Reconstruction of the system of cathodic protection of wells of Svyrydivsk gas condensate field

  • Feasibility study of expediency of decommissioning of compressor station Tarutyne

  • Development of the well №54 Svyrydivska for transportation of hydrocarbon raw materials with connection to the inhibitory farm of the well №61 Svyrydivska

  • Installation of wells №61 Svyrydivska with installation of compressor installations for operation of low-pressure wells

  • Supervision of the Construction Works during the construction of the first stage subway in the city of Dnipro
  • Consulting services in engineering and construction (Carrying out of ecological researches on preparation of the management plan of bioresources and gathering of the basic information for crossing through water obstacles on the site 3364,5-3391,2 km of the Project “Reconstruction of the gas pipeline Urengoy-Pomary-Uzhgorod”)
  • Services in supervision of construction works (Author’s supervision over the construction of the object: “Construction of a methanol warehouse for 200 m3 of the Proletarian Production Management of Underground Gas Storage)
  • Conducting training on the operation of the cathodic protection system, built on the project “EPC Works for DN700 MOP 54 gas pipeline from Kiili to Paldiski”
  • «EPC Works for DN700 MOP 54 gas pipeline from Kiili to Paldiski»
  • Modernization of pipeline electrochemical protection system of Semyrenky gas and condensate field
  • Construction of utility network electrochemical protection at “Boryspil” International Airport State Enterprise
  • Electrometric survey of pipelines of Dolyna main-pipeline field-operation department 
  • Electrochemical protection of linear section at object “Yagotyn compressor station reconstruction”
  • Technical inspection of cathodic protection stations at Boryspil Airport
  • Working project “Construction of a cathodic protection installation (CPI) at a site of 10-15 km MH Hlinska-Kremenchuk”
  • Solar power plant Skifia-Solar-1
  • Solar power plant Skifia-Solar-2
  • Bioenergy complex in the city of Zgurivka
  • Solar power plant Dymer power plant- 2,3
  • Solar power plant Port-Solar in the city of Izmail, Odesa region
  • Biogas complex with an electric power of 1 MW in the village Velyka Dymerka
  • Rozhivka-1 solar power plant
  • Rozhivka-2 solar power plant